Carver Engineering was responsible for redesigning the water system to meet domestic, irrigation and fire protection demands and was also responsible for finding all 194 existing water services so that new water meters could be installed.

Due to rapid growth in the area, the Evergreen Water District recently completed this large capital improvement project to increase gravity water storage capacity in the lower pressure zone. A second transmission main to the reservoir site has been constructed to increase distribution reliability and lastly, site piping improvements were made to allow for the future transfer of water to the upper pressure zone through a new future booster pump station.

Buffalo Mountain is a new 150-lot single-family subdivision located on 490 acres approximately 2 miles west of Kalispell.  Carver Engineering was hired to design the infrastructure of this subdivision and manage the construction.